Every project’s status, read from the work
by AGNTOfficialAgent template
Each week an agent reads your projects database in Notion and the GitHub milestone behind each project, decides whether each is on track, at risk or off track from the evidence, and posts one status page — without asking six people for an update.
Opens in AGNT and takes about a minute.
Didn’t open? AGNT may not be installed here yet. Download AGNT free · Download the .json
- 3
- Tools connected
- ~10 min
- Setup, 4 steps
- Local
- Runs on your machine
- Per category
- You approve
- Any model
- Uses the one you have
What the agent actually does
Status from evidence, not optimism
A project is on track when its milestone’s open issues fit the time left and its tasks are moving, not because its owner wrote “green” in March. The page shows the evidence behind each rating.
One page for every project
Owner, target date, progress, what changed this week and what is blocking it, for every active project, on one weekly page leadership can read in five minutes.
Changes since last week
Projects that changed status, slipped a date or gained a blocker are listed first, because those are the ones worth a conversation.
The tools this job needs
Notion
Where the work arrives. The team wiki agents can actually keep current. The agent watches it and reads what turns up in full, rather than matching a rule against a subject line.
GitHub
Context the agent pulls in before deciding. Where the code — and half the process — lives. It is read, not just referenced — which is what lets the decision account for it.
Slack
Where the result lands. Team chat where operations actually surface. Nothing is written here until the agent has formed a view and, where you asked for it, you have approved it.
The brief it works from
This is the actual instruction set the template installs — what the agent is told to do, and what it is told never to do. Every line of it is yours to edit in AGNT after install.
Read the full brief
You produce the weekly project status page from the work itself.
Read
Query the Notion projects database: name, owner, team, target date, status note, linked GitHub repository and milestone or linked task database. Read last week’s status page if one exists.
Gather evidence per project
GitHub: the milestone’s open and closed issues, issues labelled blocked, pull requests merged this week, days since the last activity. Or the Notion task database: tasks done, open and overdue. Compute progress (share done) and time elapsed toward the target date.
Rate
Use the user’s rules, or the defaults: on track if progress is within 10 points of elapsed and nothing is blocked; at risk if behind by up to 25 points or one blocker; off track otherwise. Show the numbers behind every rating.
Write and post
Create a Notion page for the week: changes since last week first (status changes, slipped dates, new blockers), then every project with owner, target date, rating, evidence, the owner’s note, and what changed. Post the summary and link to Slack.
Boundaries
Never edit project pages, issues or milestones. Never rate a project without evidence; say "no data" instead. Never blame individuals; report the work’s state.
Shown exactly as it ships. The agent inherits whichever model you already use.
Status meetings exist because status is invisible
In most teams the only way to know how a project is doing is to ask the person running it. Multiply that by every project and every manager who wants to know, and status becomes a weekly round of meetings and messages. The information already exists in the tools where the work happens: tasks in Notion, issues and pull requests in GitHub. Reading it directly gives everyone the same picture without the round of asking.
A rating with its reasons
The agent rates each project using the same rules every week: progress on the milestone compared with time elapsed, the number of overdue tasks, issues labelled blocked, and how long since anything moved. Each rating comes with the numbers that produced it. Owners can disagree, and when they do, the disagreement is about specific evidence rather than adjectives.
Owners keep the narrative
Numbers miss context: a project that looks behind may be waiting on a planned decision, and one that looks fine may have a risk nobody has logged. Where the project page in Notion has a status note from its owner, the roll-up includes it next to the evidence. Where evidence and note disagree, both are shown, which is the most useful thing a status report can do.
Common questions
Does it change project status in Notion?
No. It reads the database and creates a new status page. Owners update their own projects.
What if a project is not in GitHub?
It uses the project’s Notion task database instead: tasks done, open and overdue against the target date.
Can it report by team?
Yes, if the projects database has a team property. The page groups projects by team.
Who sees it?
The Notion location and Slack channel you choose.
What are the default rules?
On track: progress within ten points of time elapsed and nothing blocked. At risk: behind by up to twenty-five points or one blocker. Off track: beyond that.