OKR progress checked every week, honestly

by AGNTOfficialAgent template

Google SheetsNotionSlack

An agent reads your key results and their current values each week, works out progress and whether each is on track for the quarter, explains the ones that are slipping and posts the weekly picture — so off-track goals are noticed in week four, not week twelve.

Get this template

Opens in AGNT and takes about a minute.

3
Tools connected
~10 min
Setup, 4 steps
Local
Runs on your machine
Per category
You approve
Any model
Uses the one you have

What the agent actually does

Progress against time

A key result at 40% in week six of thirteen is on track; at 40% in week eleven it is not. The agent compares progress with how much of the quarter has passed, not just with the target.

Off-track ones explained

For each key result behind pace, the page shows the trend, the gap and the owner’s latest note, so the conversation starts from facts.

One page per week

A weekly page in Notion records where every objective stood, building a history of the quarter that makes the retrospective easy.

The tools this job needs

Google Sheets

Where the work arrives. The database every team already has open. The agent watches it and reads what turns up in full, rather than matching a rule against a subject line.

Notion

Context the agent pulls in before deciding. The team wiki agents can actually keep current. It is read, not just referenced — which is what lets the decision account for it.

Slack

Where the result lands. Team chat where operations actually surface. Nothing is written here until the agent has formed a view and, where you asked for it, you have approved it.

The brief it works from

This is the actual instruction set the template installs — what the agent is told to do, and what it is told never to do. Every line of it is yours to edit in AGNT after install.

Read the full brief

You track OKR progress each week and flag what is off pace.

Read

The OKR sheet: objective, key result, owner, direction (up or down), start value, target, current value, milestones if any, type (metric or binary), and the owner’s latest note with its date. The quarter’s start and end dates.

Compute

Progress = (current - start) / (target - start), respecting direction. Elapsed = share of the quarter passed. Status: on track if progress >= elapsed - 10 points (or the milestone due by now is met); at risk if within 25 points; off track otherwise. Binary key results are done or not done. Show the arithmetic.

Write

Create a Notion page for the week: objectives with their key results, each with progress, status, trend since last week, owner and latest note. Off-track and at-risk first. List key results with no update this week.

Post

Post to Slack: counts by status, the off-track key results with owners, and the page link.

Boundaries

Never edit the sheet. Never change targets or statuses by judgement; use the arithmetic. Never criticise owners; report the numbers and their notes.

Shown exactly as it ships. The agent inherits whichever model you already use.

OKRs fail quietly in the middle of the quarter

Objectives are set with energy at the start of a quarter and reviewed with regret at the end. In between, nobody checks systematically, so a key result that stalled in week three is discovered in week twelve. A weekly check that computes pace and flags what is behind turns OKRs back into a management tool rather than a reporting ritual.

Pace is the useful measure

Raw progress misleads. Some key results move in steps, some grow steadily, some only land at the end. The agent compares progress with elapsed time by default and, where a key result has milestones on the sheet, with the milestone due by now. Each key result is marked on track, at risk or off track with the arithmetic shown, so the status is a calculation rather than a feeling.

Owners keep the narrative

Numbers say whether a key result is behind; owners know why. The agent reads the latest note each owner left on the sheet and includes it. Where an off-track key result has no note, the page lists it as needing an update from its owner, which is usually enough to start the right conversation.

Common questions

Does it update the current values?

No. Owners update the sheet. The agent reads it.

Can it handle key results that go down, like churn?

Yes. Mark the direction on the sheet and progress is calculated the right way.

What about binary key results?

Mark them as done or not done; the agent reports them as such rather than as a percentage.

Can it score the quarter at the end?

Yes. On the last run of the quarter it adds the final score for each key result to the page.

Does it set the OKRs?

No. Setting objectives is a leadership decision. It tracks the ones you set.

Give AI a job. Get the proof.

The AGNT briefing

Stay in the loop.

New agents, workflows and field notes. Sign up for AGNT updates.

By subscribing, you agree to receive AGNT updates. Unsubscribe any time. Privacy policy.