What the sprint shipped, slipped and carried over
by AGNTOfficialAgent template
At the end of each sprint an agent reads the milestone’s closed and open issues and the pull requests merged, and writes the summary: what shipped, what slipped and why, what carries over — with links — posted to the team before the retro.
Opens in AGNT and takes about a minute.
Didn’t open? AGNT may not be installed here yet. Download AGNT free · Download the .json
- 2
- Tools connected
- ~10 min
- Setup, 4 steps
- Local
- Runs on your machine
- Per category
- You approve
- Any model
- Uses the one you have
What the agent actually does
Shipped, with evidence
Every completed item links its closed issue and merged pull request, so the summary is a record anyone can check.
Slipped, without blame
Items not finished are listed with their state and any reason recorded on the issue, which is the starting point the retro needs.
Carry-over, ready for planning
Open items moving to the next sprint are listed with what is left, so sprint planning starts from an accurate picture.
The tools this job needs
GitHub
Where the work arrives. Where the code — and half the process — lives. The agent watches it and reads what turns up in full, rather than matching a rule against a subject line.
Slack
Where the result lands. Team chat where operations actually surface. Nothing is written here until the agent has formed a view and, where you asked for it, you have approved it.
The brief it works from
This is the actual instruction set the template installs — what the agent is told to do, and what it is told never to do. Every line of it is yours to edit in AGNT after install.
Read the full brief
You write the end-of-sprint summary from the milestone.
Read
In the repositories the user named, the sprint milestone (or the date range and label): all issues with their state, labels, assignees and when they were added to the milestone; pull requests merged in the sprint and the issues they close.
Classify
- Shipped: closed issues, with the pull request that closed them. - Slipped: issues still open, with their state and any reason in the latest comment. - Added mid-sprint: issues added after the milestone started. - Carry-over: open issues, with what seems left from the latest comments. If points are labels, total planned, completed and added.
Write and post
Post to the team’s Slack channel: a one-line headline (shipped x of y), shipped items in plain language with links, slipped items with state and reason, added mid-sprint, and carry-over.
Boundaries
Never close, move, label or comment on issues. Never compare individuals or comment on velocity. Never describe work as shipped without a closed issue or merged pull request.
Shown exactly as it ships. The agent inherits whichever model you already use.
The sprint summary is written from memory, if at all
At the end of a sprint the team is already thinking about the next one, and the summary of what happened is either skipped or written from memory in the retro. Memory flatters: shipped work is remembered, slipped work is vague. A summary built from the milestone’s actual issues and pull requests is accurate, complete and ready before the retro starts.
Facts first, then the conversation
The summary lists what was planned, what shipped, what slipped and what was added mid-sprint, with counts and links. It does not judge velocity or compare people. Its job is to give the retro a shared set of facts, so the conversation can be about why things happened rather than what happened.
Useful beyond the team
Stakeholders outside engineering often want to know what shipped. The summary’s shipped section is written in plain language with links, so it can be forwarded to product, support or leadership without rewriting. Technical detail stays in the linked issues for anyone who wants it.
Common questions
Does it close the milestone?
No. It reads and reports. Closing and moving issues stays with the team.
Can it count story points?
If points are stored as labels on issues, it totals them for planned and completed work.
What about work added mid-sprint?
Issues added to the milestone after it started are listed separately, which is useful context for the retro.
Can it cover several repositories?
Yes. It reads the same milestone name across the repositories you list.
Does it work without milestones?
Give it a date range and a label instead, and it summarises issues closed and pull requests merged in that range.